|
Bid Tabulation Posted 7/31/16 - Select "Tabulation 1612" under "Related Document" below. Yellow highlighted contractor has been awarded bid/project.
Amendment No. 1 Posted - 5/26/16; Select "Amendment No. 1" under "Related Documents" below to view/download amendment.
The project consists of installation of approximately 215 linear feet of 8” ductile iron pipe, valves, fittings and appurtenances for connection of NTUA Twin Lakes Well to NGWSP Reach 12A.
This project is funded by the Water Trust Board through the New Mexico Finance Authority, WTB #111
A Pre-Bid viewing of the site for all plan holders to be held May 19, 2016 at 9:00 AM. All interested parties shall assemble at DePauli Engineering and Surveying, LLC at 307 S. 4th Street, Gallup, NM.
|
|
5/14/2016 8:00 AM
|
|
Gallup Independent; Albuquerque Journal
|
|
6/1/2016 2:00 PM
|
|
Frances Rodriguez (505) 863-1334 frodriguez@gallupnm.gov
|
|
No
|
|
$300.00
|
|
DePauli Engineering & Surveying 307 S. 4th Street Gallup, NM 87301
|
|
City of Gallup M-F; 8-5
|
|
(505) 722-5133
|
|
|
|