Bid Number: Formal Bid No. 1610
Bid Title: Boardman Drive & Ridgecrest Avenue Water Line Extensions
Category: Construction / Public Works
Status: Closed

Description:
Bid Tabulation Posted 7/31/16 - Select "Tabulation 1610" under "Related Documents".  Contractor highlighted in yellow has been awarded project.

Amendment No. Posted 4/26/16 - Select "Amendment No. 1" under "Related Documents" to view/download amendment.


Project consists of the following:

LOT 1 – BOARDMAN DRIVE

This portion of the project consists of installing approximately 2,125 linear feet of 10 inch C900-07 DR18 waterline as shown on the contract drawings. Waterline will be installed under existing wash, through landscaping including trees and across Boardman Drive. Work will include two (2) tie-in connections to existing 8-inch waterline material specified in contract drawings. Work will include installation of 20-inch schedule 40 steel casing and PVC carrier pipe (L=81’) with restraints across Boardman Drive (Hwy NM 564). Work will include installation of three (3) fire hydrant assemblies and a number of gate valves and fittings. Work site is along and across Boardman Drive (Hwy NM 564). Traffic control will be required. Work will include trenching, backfilling, compaction and compaction testing. Sidewalk, curb/gutter and asphalt removal and replacement will be required. Advertisement and notification of water shut-off of all affected customers 48 hours prior to shut-off is included in this portion of work. This portion of the project is located in Gallup, New Mexico adjacent and across Boardman Drive (Hwy NM 564).

LOT 2 – RIDGECREST AVENUE

This portion of the project consists of installing approximately 350 linear feet of 6 inch C900-07 DR18 waterline. Waterline installation will be within an existing residential asphalt road. Work shall include two (2) tie-ins to existing A.C. and D.I. waterlines, as well as gate valves and fitting installation. Traffic control will be required. Work will include trenching, backfilling, compaction and compaction testing. Asphalt removal and replacement will be required.  This portion of the project is located in Gallup, New Mexico within Ridgecrest Avenue.

Publication Date/Time:
4/9/2016 8:00 AM
Closing Date/Time:
4/28/2016 2:00 PM
Pre-bid Meeting:
No
Contact Person:
Frances Rodriguez
(505) 863-1334
frodriguez@gallupnm.gov
Download Available:
No
Fee:
$250.00
Plan & Spec Available:
DePauli Engineering and Surveying, LLC,
307 S. 4th Street, Gallup, NM 87301
(505) 863-5440