Streets & Storm Drainage

This division of the Public Works Department has the following responsibilities and any additional as directed by Higher Authority:

1. Roadway Maintenance and Repair*
* For those rights-of-way under City maintenance jurisdiction; other rights-of-way within City limits may be under NMDOT maintenance jurisdiction

A. Roadway Maintenance

1. Pothole Repair(s)
2. Pavement Crack Sealing
3. Pavement Seal Coating
4. Surface Grading

B. Roadway Repair

1. Base Course Construction
2. Mill and Asphalt Overlay(s)
3. Asphalt Millings and/or Gravel Surfacing

C. Cutting Weeds & Bush Hogging Shoulder(s)



2. Traffic Control Maintenance*

* For those rights-of-way under City maintenance jurisdiction; other rights-of-way within City limits may be under NMDOT maintenance jurisdiction.

A. Street Signage

B. Street Striping

C. Guard Rail Installation & Repairs

D. Work Zone Traffic Control



3. Storm Drainage Maintenance and Repair*

* For those rights-of-way under City maintenance jurisdiction; other rights-of-way within City limits may be under NMDOT maintenance jurisdiction.

A. Street Drainage

1. Curb and Gutters
2. Cross-Drainage Structures
a. Drainage Pans
b. Culverts
c. Headwalls
3. Parallel Drainage Structures
a. Drop Inlets
b. Culverts
c. Bar Ditches
a. Grading
b. Erosion Control
4. Concrete Box Culverts

B. Drainage Channel(s)


C. Cutting Weeds & Bush Hogging Vegetation

D. Flood Control Structures

1. Puerco River
a. Flood Control Embankments
a. 30,000 CY Annual Sediment Removal
b. Flood Control Gate
2. Little Puerco Dam & Impoundment Area
3. Park Avenue Dam & Impoundment Area
4. Neighborhood Detention Basins
a. Bubany Park
b. Coyote Canyon
c. Verdi Drive


4. Alley Maintenance

A. Grading

B. Asphalt Millings and/or Gravel Surfacing

C. Cutting Weeds & Bush Hogging Vegetation Overgrowth



5. Contract Administration For "Minor Concrete Work"

• Note: Principal contractor is Joe Wauford Construction.

A. Curb & Gutter(s)

B. Sidewalk(s)

C. Storm Drainage Pan(s)



6. Airport Operations, Maintenance, & Repairs

• Note: Daily airport operations including NOTAMs are the purview of the FBO.

A. Contract Administration

1. FAA & State Aviation Grants
a. Airport Infrastructure Capital Improvement Plan
2. Fixed Based Operator (FBO)
3. Tenant Leases (w/ Legal)

B. Air Operations

1. Notices To Airman (NOTAMs)
2. Emergency/Crash Response (w/ Fire Department)
3. Airport Security
a. Perimeter Fence Maintenance

C. Flight Aides Maintenance & Repairs

1. Runway/Taxiway Lighting
2. Precision Approach Indicators
3. Windsocks
4. Light Beacon

D. Pavement Maintenance & Repairs

1. Pothole Repair(s)
2. Crack Sealing
3. Seal Coating
4. Surface Striping

E. Grounds Maintenance

1. Hand Trimming Terminal, Parking, & Hangar Areas
2. Bush Hogging Runway & Safety Zones
3. Storm Drainage Maintenance including Retention Pond
4. Runway Animal Control
5. Mosquito Vector Control (For Airport ONLY)

F. Foreign Object Debris (FOD) Sweeping

G. Runway Snow Removal

H. Terminal Maintenance & Repairs

I. Hangar Maintenance & Repairs

J. Outdoor Lighting Maintenance



7. Contingency Operations

A. Snow Removal

B. Flash Flooding

C. Disaster Recovery

(As Assigned By Higher Authority)


8. Special Projects

A. For Administrative Services

B. For Fire Department

C. For Joint Utilities

D. For Parks

E. For Police Department

F. For Recreatio

n


9. Other Public Functions & Services

(As Assigned By Higher Authority)

A. Special Civic Events

B. Urban Trail Construction

C. Golf Course Reconstruction

D. Urban Blight Demolition & Clean-Up





ONLINE RESOURCES

2011-12 Snow Route Map (a/k/a Snow Removal Map)

2015 Street Index Map w/ Street Classifications

Standard Drawings, Series 2400 (UPDATE PENDING)